Each button, menu and setting of Mewboard, what it does and where to find it. The pictures are real screenshots of the app.
13 languagesUpdated October 2026
Nothing found. Try another word, or write to us at support@mewboard.com: we will tell you whether Mewboard can do it.
01
Getting started
Create an account in a minute. Sign in with a password or with Google, Apple or Telegram.
Sign in
Type your name or email and your password, or choose Continue with Google, Continue with Apple or Continue with Telegram. The eye button shows the password you typed.
You stay signed in for 30 days. When you change your password, every other device is signed out. After several wrong passwords the form waits a few minutes before it accepts new attempts, so nobody can guess a password.
The sign-in screen
Create an account
Press Create an account, enter your email and a password of at least 8 characters. Your name and the name of your workspace are optional. You get your own workspace with a 7-day trial of everything, and you are its administrator.
Mewboard then sends a confirmation link to your email. It works for 3 days. Resend the email sends a new one. On servers that only accept invited people, the form also asks for an Invitation code.
Create an accountThe confirmation email is on its way
A new workspace opens with Get started: three steps that tick themselves. Connect your AI (ready instructions and the address for Claude, ChatGPT, Claude Code and Cursor), add example projects for your kind of work, and copy a first request for your AI. Hide it with × when you no longer need it.
Google, Apple and Telegram
With Google or Apple, Mewboard finds your account by your confirmed email, or creates a new one. Telegram needs no email at all. To add Telegram to an account you already have, open My account and press Connect Telegram under Sign in with Telegram.
Forgot your password
Forgot password? on the sign-in screen sends a link to choose a new password. The link works once and for one hour. The answer looks the same whether or not the address has an account, so nobody can use it to check who is registered.
02
Finding your way around
A sidebar on the left, the page on the right. Everything is one or two clicks away.
The window
The sidebar holds your workspace, the notification bell, your projects and your settings. The page shows the project you opened: its name, search, Filter, Display, New issue, and the tabs Board, List, Timeline, Calendar, Milestones and Overview.
A project board, with the sidebar on the left
Sidebar
At the top: the workspace name (click it to switch workspaces), a dot that is green while changes arrive live and red while the connection is lost, and the bell with the number of unread notifications.
All projects opens the list of every project.
Each project shows how many issues are still open: in Backlog, Todo, In Progress or In Review.
At the bottom: Trash with the number of deleted items, Appearance, Send feedback and your name with your role.
The sidebar: a pinned project and a group of client projects
Pin projects and sort them into groups
Point at a project in the sidebar and press the three dots. Pin to the top keeps it above everything else. Move to group puts it into a group, and New group… creates one, for example Clients or Internal. The folder button next to All projects also creates a group.
Drag projects with the mouse to change their order or to move them between groups. Click a group to fold it. The group menu can rename it, move it up or down, or delete it (its projects stay). Your layout is yours alone, and it follows you to every device.
Need more room? Press Hide sidebar at the top of the sidebar, and it slides away. Move the pointer to the left edge of the window and it slides back in; press Keep the sidebar open to pin it again. The choice is remembered on this device. On phones the sidebar is the menu button, as before.
Order the projects the way you like. Sort projects next to All projects sorts all of them by name, by the last activity (the newest issue change or comment) or newest first; Manual order keeps your own drag order. A folder has its own choice too: open its menu and use Sort this folder, or leave it on Same as all projects.
Many folders? Collapse all next to All projects folds every folder and the pinned list at once, so only their names are left; when everything is folded, the same button turns into Expand all.
With many projects, press Ctrl+K (or the Find a project row at the top of the sidebar), type a few letters of the name, the key or the client, and press Enter to open it. The arrow keys move through the matches; with nothing typed, the most recently active projects come first.
The project menu in the sidebar
All projects
Every project of the workspace, as Cards, a List or a Timeline. A card shows the status, the start of the description, a progress bar and the dates. Progress is the share of issues that are Done.
Search projects looks in names, keys and descriptions as you type.
Filter shows projects by status (Planned, Active, Paused, Completed, Canceled) and by target date: overdue, the next 7 or 30 days, later, finished or without a date. Each choice shows how many projects it has.
Sort orders them by date of creation, name, target date, progress or the number of open issues.
On the timeline each project is a bar from its start to its target date. Drag the bar or its ends to change the dates.
Your choice of view, filter and order is remembered in this browser.
All projects as cards
As a list, with progress and datesOn a timeline
Filtering projects by status
Several workspaces
A workspace is a separate space with its own projects and people, for example one per client or one for a side project. Click the workspace name at the top of the sidebar to switch, or choose New workspace… to create one. You can be the administrator of up to three workspaces and a member of any number.
A new workspace can start empty or from a template for your kind of business: Software team, Marketing agency, Online store, Freelancer, Online school, Event planning, Construction and renovation and more. A template adds a few projects with milestones, starter tasks and checklists, named in your language; rename or delete anything later.
Your role is set per workspace: you can be the administrator in one and a viewer in another. Everything you see, including search and notifications, belongs to the workspace that is open.
Switching workspaces
Join a workspace by link
An administrator sends you an invitation link. Open it while you are signed in, press Join, and the workspace appears in your list with the role the link gives. A link works once and for 14 days. You can leave a workspace later in My account.
Joining a workspace
Trash
Deleted issues and whole projects wait in the trash for 14 days, then they are erased with their comments and files. Restore brings an item back exactly as it was. Delete forever erases it at once, and Empty trash erases everything. The trash is shared by the whole workspace.
Two issues and a project in the trash
Send feedback
Found a bug or have an idea? Send feedback in the sidebar sends a note straight to the Mewboard team, with your name and the page you are on.
Send feedback
Your menu
Click your name at the bottom of the sidebar. My account is for your profile, password and connected apps. Administrators also see People and Connected apps. Sign out ends the session on this device.
The menu under your name
03
Projects
A project holds issues, milestones, files and notes. Each one has a short key that names its issues.
Create a project
Press New project on the projects page or the plus next to All projects at the top of the sidebar. Only the name is required. The key is 1 to 8 letters or digits: WEB turns issues into WEB-1, WEB-2 and so on. Leave it empty and Mewboard makes one from the name. You can also add a description and the start and target dates.
A workspace can have any number of projects.
A new project
The projects page
All projects shows every project as Cards, a List or a Timeline. Filter narrows it down by the section of your sidebar (a sub-project counts in the section of its top project), status, target date, last activity, open issues, level (projects or sub-projects) and client. Sort orders them and groups them by section, client, status or parent project, so you see at a glance where each part of your work stands. A sub-project shows the name of its parent above its own.
In the List tick the boxes of several projects (the box in the heading selects all of them, Shift picks a range) and change their Status or Section at once from the bar below, for example to close projects that went quiet long ago. Hide completed and canceled under Sort keeps the finished ones out of sight.
In the List, Columns lets you choose what to see: status, progress, open issues, schedule, client, section, last activity, the money of each project (Budget, Received, To receive, with its sub-projects) and the sum of any number or money field of its issues, such as hours.
Issue numbers and links
Every issue gets a number like WEB-12 that never changes and is never given to another issue, even after the first one is deleted. Each issue has its own link, and each comment has one too. The link button next to the number copies it. People and agents use these numbers to point at the same issue.
Overview
The Overview tab is the project's front page: the description with pictures and links, the dates, the project's files and comments about the whole project. Edit changes the name, description and dates. Drop files anywhere on the description to attach them, or press Attach files.
On the right of the Overview there is a panel with everything you can change about the project, like the properties of an issue: the name, the Status, the Client, the Start date and the Target date, the Group of your sidebar it sits in, pinning it to the top, a reminder, the change history and Move to trash. Each change is saved at once.
A project can show an emoji instead of the first letter of its key, in the sidebar, on the project cards and in its header. On the Overview, press Choose an emoji next to Icon, pick one from the list or paste any emoji of your own; Remove icon brings the letter back. The icon is also a field in the New and Edit project windows, and AI agents can set it through MCP.
When an AI agent creates a project for you, it picks an emoji that fits it, a cart for an online shop or a phone for a mobile app; if it does not, Mewboard picks one from the project's name.
The picker holds the whole emoji set, in categories like in a messenger: the tabs on top jump to a category, the search finds an emoji by its name in the language of the interface (or in English), and the ones you used last are shown first.
Instead of an emoji the icon can be a picture of your own, for example a client’s logo: press Upload a picture… in the same window and choose any image. It is cut to a square and shrunk in the browser, replaces the emoji (and an emoji replaces it), and Remove icon deletes it.
Below are the project's Email and Telegram settings, described under Requests from outside.
A project overview with a picture and a PDF in its files
Sub-projects
A big project can be split into parts: “Client Acme” with “Website”, “Telegram bot” and “Ads” inside it, up to three levels deep. Each sub-project is a full project with its own key, board, statuses, fields and files. In the sidebar sub-projects sit under their parent and fold away with the arrow; the header shows the path.
On the parent’s Overview, Sub-projects lists them with their progress, and Add sub-project creates one. To move an existing project, pick its Parent project on its Overview or in the New project window. A sub-project takes the parent’s client unless it has its own. Access to a parent opens its sub-projects, and moving a parent to the trash takes the whole tree with it (restoring brings it all back). AI agents can create and move sub-projects too.
On a project with sub-projects, the button With sub-projects next to Display shows the issues of the whole tree on the board, in the list, on the timeline and in the calendar; each card keeps its sub-project’s key. Columns then follow the six kinds of status, so issues of projects with different own statuses meet in one board; moving a card sets the first status of that kind in its own project. The choice is remembered per project.
Templates keep the tree too. Save as template… on a parent offers to keep its sub-projects, a workspace template keeps the whole tree, and a new project made from such a template gets the same sub-projects under it. In the template editor, Add sub-project adds one under the open project and Parent project moves it.
Project status
Next to the description: Planned, Active, Paused, Completed or Canceled. The status shows on the projects page and works in its filter. A completed or canceled project is never shown as overdue.
Choosing a project status
Your own templates
Set up a project once and reuse it: on its Overview, press Save as template…. The template keeps the statuses, fields and milestones, and if you like the open issues with their checklists as starter tasks. People, comments, files and clients stay behind, and dates move with the day you use it.
Pick the template in the New project window to start a project from it. An administrator can also Save this workspace as a template… under My account; such a template shows up first in the New workspace window. Rename or delete your templates in the Templates section of My account.
Templates have their own editor too: in My account → Templates press Edit on a template, or New project template to start from scratch. Change the name, icon and description, the statuses, fields and milestones, and the starter tasks with their priority, labels, due date (in days), description and checklists, then press Save. A workspace template lists its projects as tabs. AI agents can read, create and change templates through MCP.
Your own statuses
Each project can have its own statuses, so the board speaks the language of your work: New order, Paid, Shipped, Delivered for a shop, or Brief, Draft, Client review, Published for content. On the Overview, press the row Statuses: rename, add, reorder or remove them. Up to 20 statuses per project.
Every status belongs to one of six kinds (Backlog, Todo, In progress, In review, Done, Canceled). The kind decides whether an issue counts as open, done or canceled, so due dates, My issues and reports keep working. Issues of a removed status move to the first status of the same kind. Back to the standard statuses restores the six usual ones; AI agents can set statuses by name.
A status can also have its own icon: in the statuses window, press the icon at the start of a row and pick any emoji (🔥 for urgent, 💰 for paid…). It shows on the board columns, in the list, the filter and the issue window; without one, the status keeps the icon of its kind.
Your own fields
Every project can have its own fields for what matters in your business: a budget, a platform, a contact person, a link to the brief. On the Overview, under Fields, press Add field, give it a name and a type: text, number, date, one choice, several choices, link, person or checkbox. Up to 30 fields per project.
The fields appear in the properties of every issue of the project, and a value is saved as soon as you change it. Tick Show on cards to see a field on the board cards. AI agents read and fill the fields through MCP, by their names.
A Money field keeps an amount in the currency you pick for it (Currency: hryvnia, dollar, euro and 17 more). Type it any way you like, "12 000,50" or "$1,200.50": cards and issues show it as 12 000 ₴ in the format of your language.
Fields work in Filter and Display too: filter by a choice, a checkbox or a person, or by whether a field is filled; make the board columns from a choice, checkbox or person field (dropping a card into a column sets the value); order by a number, an amount or a date.
A Formula field is calculated from the other fields of the issue, like in Notion: what is left to pay, whether a payment is late, how many days are left. Field names go in curly braces and the window helps: it offers the fields, the functions and examples, and shows the result in your newest issues while you type. A formula with a currency shows money; you can filter, group and sort by it.
A Payments field splits the payment of one issue into parts: 50 % in advance, received on 1 November, and 50 % on delivery, still expected. Tick a part when the money comes in; the card shows "received $50 of $100", and formulas and totals see what was received and what is expected.
Under Display, Totals add the sum, average, minimum or maximum of a number, money or payments field to every board column and list group.
The project's Finance tab shows its money, sub-projects included: the Budget you agreed (change it whenever the work grows; leave it empty and the total of the tasks is the budget) against the Cost of tasks, what was received, what is expected and what is still to receive, plus the totals of every field. A client's window shows the same for all their projects. Amounts in other currencies are converted at the National Bank of Ukraine rate, and a formula can do it too: convert({Amount}, "UAH", "USD", {Paid on}). The Overview keeps a short summary of it, and Filter → Money shows only the issues with an amount or payments.
A payment can be in another currency than its field: pick it next to the amount (a dollar advance in a hryvnia project). It counts at the National Bank of Ukraine rate of the payment's date, and the issue shows the equivalent.
The Client project with payments template (in the New project window) starts with everything set up: statuses from New to Delivered, a Cost and a Payments field, formulas for what is Left to pay and for the Payment state (paid, partly paid, waiting, overdue), and starter tasks for the advance and the final payment.
To bring issues in from a spreadsheet or another CRM, open the project's Overview → Import and choose a CSV or Excel file, or paste the cells. Mewboard guesses what each column is (title, status, due date, your fields, a payment's amount, date and note) and you correct it; a column can also become a new field. Rows with the same title can become one issue with several payments, which is how a payment history moves in.
The budget grows with the work by itself: it is the agreed amount, or the total of the tasks when that is more (a task counts with its cost, or with its payments). An invoice for extra work raises the budget and shows up in what is left to receive, with no need to edit the budget by hand.
Milestones
A milestone is a goal inside a project, such as a beta or a launch: a name, a description, a target date and a status (Planned, In Progress, Done). The Milestones tab shows each one with a progress bar and its issues. Add issues to a milestone in the issue window, or drag them into its column when the board is grouped by milestone.
Deleting a milestone keeps its issues. They simply have no milestone anymore.
Two milestones with their progress and issues
Delete or restore a project
Delete on the overview moves the whole project to the trash with its issues, comments and files. For 14 days you can Restore it from the trash, and everything comes back.
04
Issues
An issue is one piece of work: a title, a description, its details, checklists, files and a conversation.
Create an issue
Press New issue or the C key. Write a title, a description if you like, and choose the status, priority, milestone and dates. Paste or drop pictures and files into the description: they are uploaded with the issue. Ctrl+Enter creates it.
You can also start from the plus at the top of a board column (the issue gets that column's status, priority or milestone) or from a day in the calendar (the issue is due that day).
A new issue
The issue window
Clicking an issue opens it over the page you were on. On the left: the number, who created it and when, the title, the description, files, checklists and comments. On the right: its details and Move to trash. Close it with the cross, Esc or a click outside, and you are back where you were. Its details are saved the moment you change them.
An issue with two checklists
Status, priority and other details
Status: where the work is. Choosing a new one moves the issue to the end of that column.
Priority: Urgent, High, Medium, Low or none.
Milestone: one of the project's milestones.
Start date and Due date: a calendar with Today and Clear. The start cannot be after the due date.
Assignee: the person or agent doing the work.
Labels: short tags separated by commas. A new word becomes a new label, and each label keeps its own colour.
Mewboard adds the labels telegram, email and share itself, so you can see where a request came from.
Changing the statusChoosing a due date
Statuses and priorities
Status
Meaning
Backlog
Ideas and work for later. New issues start here.
Todo
Planned next.
In Progress
Someone is on it. Its card carries a small pulsing dot.
In Review
Done, waiting for a check.
Done
Finished. Counts towards progress.
Canceled
Not going to happen. Kept for the record.
Priority
Order
Urgent
First everywhere
High
2
Medium
3
Low
4
No priority
Last. The default.
Due dates
A card shows its due date as a small chip: red when it is overdue, amber when it is due today or within two days, and Today or Tomorrow instead of a date. Done and canceled issues are never overdue. The same groups (overdue, today, the next 7 days, later, no date) work in Filter and Display.
Description in Markdown
Click the description to edit it. It understands bold text, inline code and code blocks, links and pictures. Paste a screenshot or drop a file and it is uploaded and inserted where the cursor is. Video and audio files play right in the text. Save or Ctrl+Enter saves, Esc cancels.
Editing a description; below, a checklist and the comments
Checklists
Split an issue into steps. Add checklist creates a named list. Type into Add an item and press Enter for the next one. Tick items as they are done, click any text to change it, and watch the percentage and the bar fill up. Hide checked items keeps long lists short.
An issue can have up to 20 checklists of up to 200 items. The card on the board shows how many items are done, for example 3/5, and turns green when all are.
Two checklists, one of them 80% done
Comments
The conversation sits under the issue, oldest first, with the author and the time. Comments use the same Markdown, and you can attach files with Attach, by pasting or by dropping them. Ctrl+Enter sends. The link button copies a link to that exact comment: opening it scrolls to the comment and highlights it.
Comments made by Claude and other agents look like everyone else's, signed with their name.
Next to the link button, the copy button copies the content itself: the whole text of a comment, or the issue's title and description with its pictures. Paste it into a document, an email or a chat: the text keeps its lines and the pictures come along.
Pin the comments that matter with the pin button of a comment (Pin). Like pinned messages in Telegram, a bar at the top of the conversation shows them: a click jumps to the pinned comment and the bar moves on to the next one, and the counter on its right lists them all. Agents pin and unpin with update_comment.
The Oldest first / Newest first button next to the conversation turns it over; with the newest first the comment box moves to the top. The choice is kept on this device. In a long conversation round arrows in the corner jump to the top or to the bottom, like in Telegram.
A screenshot from a phone, then Claude Code explains the fix
Files and pictures
Attach files to an issue, a comment or a whole project. Pictures show as square previews, video and audio get a player, and other files a tile with their type. Click a picture to open the viewer: zoom with the mouse wheel or the + and − buttons, drag to move, Fit or 1:1, the arrows for the next picture. Keys: ←→, +−, 0, 1, Esc.
Under every file, document, picture, video or audio there is a Link button, and one after a file link in a description or a comment: it copies the address of the file, to paste into a chat, an email or a comment. Whoever opens it must be signed in to Mewboard and have access to the project.
With two or more files, tick the ones you want, or Select all, and press the copy button above them: all their addresses are copied at once, one per line. With nothing ticked it copies the links of all the files.
A file can be up to 100 MB, and a workspace holds 20 GB.
A picture in the description and a PDF among the filesThe picture viewer
Move to trash, and undo
Move to trash in the issue window, the bar of selected issues or the Delete key sends issues to the trash without asking. A message with Undo stays for a few seconds to bring them back at once. After that they wait in the trash for 14 days.
The Undo message in the corner
When someone else changes the issue you are reading
The issue window updates by itself. If you are typing at that moment, Mewboard does not touch your text: a line at the top says the issue has just changed, with a button to refresh it when you are ready.
05
Views
The same issues as a board, a list, a timeline or a calendar. Search, filter and display settings work in all of them.
Board
A column per status, with the number of issues at the top. Drag a card to another column to change its status, or up and down to change its place. Columns can also be priorities, people, milestones, due dates or labels (see Display), and dropping a card into such a column sets that value.
A column shows 50 cards at a time, with a button for the rest. On a phone, press and hold a card to drag it.
The board, a column per status
What a card shows
From the top: the priority, the number, a pulsing dot while the issue is in progress, and the assignee. Then the title. Then the labels, the milestone, the due date, the number of comments and the checklist progress. Display decides which of these you see.
A paperclip with a number means the issue has files, counting those attached to its comments too. Hide it in Display if you do not need it.
High priority, in progress, due in two days, 2 comments, checklist 2 of 4
List
A table grouped by status (or any other grouping), with the number, priority, title, status, milestone, due date and assignee. Click a group heading to fold it. Each group shows 100 rows at a time.
The list
Timeline
Every issue as a bar from its start date to its due date, coloured by status, with milestones as diamonds and a line for today. Drag a bar to move it, drag its ends to change the start or the due date, or drag along an empty line to give an issue its first dates. Week, Month and Quarter change the scale, Today scrolls back to today.
The timeline by month, grouped by status
Calendar
A month at a glance. Each issue sits on its due date (or its start date when it has no due date). Click a day to see all of its issues below the calendar, and use the plus on a day to create an issue due then. Issues without a date wait in a list under the calendar: drag one onto a day to set its due date.
The calendar, today selected
Search and Filter
Search issues finds issues by title and number as you type. The / key jumps into it.
Filter narrows the view by status, priority, assignee, label, milestone and due date. Pick several values in a field to see any of them; fields combine. Every value shows how many issues have it. Active filters stay visible as chips under the tabs, each with a cross to remove it. Filters are remembered per project in this browser.
The board filtered to Todo and In Progress
Display
Columns on the board, Grouping elsewhere: status, priority, assignee, milestone, due date, label or none.
Ordering: by hand (the order you dragged), priority, due date, recently updated or newest. Both can be reversed.
Order completed by recency puts finished issues last, the most recent first.
Completed issues: all, the past week, the past month, or none.
Show empty groups in the list.
Display properties: which details cards and rows show.
Display settings over the list
Work on several issues at once
Select issues with Shift or Ctrl and a click, with X, with Ctrl+A, or by drawing a rectangle on an empty part of the board. A bar appears at the bottom: change Status or Priority of all of them, Copy links, or Move to trash. Dragging one of the selected cards moves them all.
Three issues selected, choosing a new status for all of them
Keyboard shortcuts
Press ? to see them all. They work on the selected issues, or on the one under the mouse.
C
New issue
/
Search
JK · ↑↓
Move between issues
←→
Move between columns
Enter
Open the issue
X · Ctrl+A
Select or unselect · Select all
S · P
Change status · Change priority
Y
Copy link
Delete
Move to trash
G then BLCMOT
Board, List, Calendar, Milestones, Overview, Trash
Esc
Clear selection, close
Ctrl+Enter
Save a form, send a comment
The list of shortcuts
06
Notifications and live updates
What the team and your agents change appears on your screen at once, and the bell keeps the list.
The bell
The bell collects what happened in the workspace: new issues, status changes, new comments, issues moved to the trash or restored, whether a person, an agent, Telegram or an email did it. The number on the bell, and in the browser tab, counts what is new for you; your own changes are not counted. Click a line to open that issue or comment. Mark all as read clears the number. Notifications are kept for 45 days.
Six unread changes by Leo and Claude Code
Assignee
Every issue has an Assignee: pick a member of the workspace from the list (people and AI agents), or choose Someone else… for a person without an account, such as a client. A name typed through the API or by an agent is matched with the members, so “igor” becomes Igor; “me” assigns the issue to the caller.
My issues in the sidebar lists the open issues assigned to you across all projects, the most urgent first.
When someone else assigns an issue to you, it shows up in your bell with a pop-up. Under My account, in Notifications, you can also get it by email and in Telegram.
Clients
A client is the person or company a project is for. Open Clients in the sidebar to add them with a company, email, phone and notes, or create one on the spot with the plus next to Client when you create or edit a project.
A project has one client, and its issues follow it. An issue can have its own client in its properties, and goes back to the project’s with Same as project. Everything is optional: projects and issues work without a client.
Clients lists each client with their projects and the number of open issues. Deleting a client only unlinks it: projects and issues stay. AI agents can manage clients and set them on projects and issues through MCP.
The page is a table you can search and sort by name, projects or open issues. Click a client to open a window with the contact details, the notes and the projects, and edit or delete the client from there.
Reports
Reports in the sidebar gathers the money of every project you can see from their Payments fields: what was received, the expenses (payments with a minus sign), the net, what is expected and what is overdue. A chart shows the months, two lists split the money by project and by client, and a table lists every payment.
Pick a period (this month, quarter, year, the last 12 months or your own dates), a currency, a project or a client. Each payment is converted at the National Bank of Ukraine rate of its own date, so a dollar payment from March counts at the March rate. Download CSV saves the payments for a spreadsheet or your accountant.
Who owes us lists every payment still expected, by client, largest debt first: what each one is for, with a link to the issue, its date and whether it is overdue. Copy reminder puts a polite message with that list on the clipboard, ready to send to the client.
History
History in the sidebar lists every change to issues and comments: who made it (a person in the web app, an agent or the API, or an undo), when, and what the value was before and after. Changes by the same person or agent less than two minutes apart are grouped into one batch, so ten tasks moved by an agent are one line you can open.
If an agent misunderstood the plan, press Undo all on its batch, or tick some changes and press Undo selected. Undo is careful: a field is put back only if it still has the value that change set. Anything someone changed afterwards is left alone and listed as not reverted. Issues created in the batch go to the trash, trashed ones come back, comments it added are deleted and deleted ones are restored. An undo is itself a batch, so it can be undone.
Change history in an issue’s properties opens the history of that issue. AI agents can read the history and undo their own mistakes through MCP. History is kept for 90 days.
Reminders
Press Remind me on an issue, on a comment or on a project's Overview to be reminded at a time you choose: in an hour, tomorrow morning, next Monday, or any date and time. You can add a note and repeat the reminder every day, week or month.
A reminder always shows up in the bell, with a pop-up if Mewboard is open. Under My account, in Notifications, you can also get it by email, and in Telegram after you press Connect Telegram and Start in the bot.
All your reminders are on the Reminders page in the sidebar: cancel one, or snooze one that has fired. Reminders are personal, nobody else sees them. AI agents can set reminders through MCP.
Notifications
When you work on a project together, Mewboard tells the people who follow an issue what changed: its author, its assignee, everyone who commented on it, and anyone you mention with @Name. New comments, status changes, checklists, due dates and files all count; changes made one after another are merged into one notice, and your own changes (and your AI agent's) never notify you. They appear in the bell under For me (Everything shows all the activity of the workspace), in Telegram if you connected it, and by email: Right away, Once a day (the default) or Off, under Changes in issues you follow in My account. People only ever hear about projects they can see.
Press Follow in the properties of any issue to hear about it, press it again to stop. Each project has its own level, set on its Overview under Notifications or all at once in My account → Notifications by project: Everything (every change and every new issue), Only what I follow (the default) or Only @mentions. Email summaries can also come Once an hour.
All notifications at the bottom of the bell opens the page My notifications: everything meant for you with Only unread and a project filter, and the tab Issues I follow with the reason for each and an Unfollow button. AI agents can read the same through MCP: what is new for you, which issues you follow, follow or unfollow one, and set a project’s level.
Live updates
When someone else moves a card, the board redraws without a reload, the card flashes briefly and a small message says who changed what. Click the message to open the issue. Mewboard never redraws under your hands: not while you drag a card, type, or have a menu open. It catches up a moment later.
Leo just moved WEB-7 to In Progress
Sounds
A soft two-note sound when someone else moves an issue to In Review, and a short chime when it moves to Done. Your own changes are silent. Turn each one on or off and set the volume in Appearance; the setting belongs to this device.
07
Requests from outside
Clients and colleagues do not need an account to send you work. Their messages become issues by themselves.
Telegram
Telegram turns messages into issues. On a project's Overview, press Connect Telegram and choose where the requests come from. A project can take messages from several sources at once; each chat belongs to one project only.
Private chat: your own dialog with the bot. Press Start, then forward messages to the bot from any chat. A bot cannot read your other chats by itself, so everything you forward here becomes an issue.
Group chat: choose a group in Telegram and the bot joins it. If your group is missing from Telegram’s list, add the bot to it yourself and send the command that Mewboard shows. Make the bot an administrator of the group, otherwise Telegram shows it only commands and replies.
Telegram channel: add the bot to your channel as an administrator and post the command that Mewboard shows in the channel. Every post becomes an issue.
Personal chats (Premium): for accounts with Telegram Premium. Press the button to link your Telegram account, then in Telegram open Settings → Business → Chatbots, add the bot and choose the chats it may read. The first time someone writes in such a chat, the bot asks you, in your dialog with it, which project the chat belongs to, or whether to ignore it. The bot never writes into these chats, and your own messages are not saved.
Every message in a connected chat becomes an issue in that project: text, photos, files, voice messages and videos, up to 20 MB each. An album becomes one issue with all its files. The issue gets the label telegram and the name of the person who wrote the message (in a group, a channel or a personal chat also the name of the chat), and the bot answers with its number.
Connecting another project never takes a chat away from the first, so use a separate group or channel for each project. The list under the button shows every connected chat with its own Disconnect button; /stop in a chat does the same, and in a group only administrators may send it. /status shows where a chat saves to, and /forget makes the bot ask again about personal chats you ignored. In channels and personal chats the bot stays silent; elsewhere it answers in the language of your Telegram.
Telegram connected to Client support
Email
Turn on email gives the project its own address. Send or forward a letter to it and it becomes an issue: the subject is the title, the text is the description, attachments are saved, and the label is email. A reply with the issue number in square brackets in the subject, like [WEB-12], is added to that issue as a comment.
To keep spam out, list the addresses or whole domains that may write. Get a new address replaces the address at once. Automatic replies are ignored, and a project accepts up to 100 letters a day.
The project's address, open to one client only
Share from your phone
Install Mewboard on your phone (see On your phone), and it appears in the Share menu of other apps. Share a note, a link or a message, choose the project, check the title, and it becomes an issue with the label share.
A note shared from another app
Where requests land
Requests arrive in Backlog like any other issue, so you can sort, assign and answer them in one place.
Requests from email, Telegram and the phone on one board
08
Claude and other AI agents
Agents work on the same issues as people, through MCP. Everything they do is signed and appears live.
Connect Claude
In Claude (on the web, the desktop app or the phone), open Settings → Connectors, choose Add custom connector and paste this address:
https://app.mewboard.com/mcp
A Mewboard window opens. Sign in, check what Claude will be allowed to do and press Allow. Claude never sees your password. It works as you, in the workspace that was open when you allowed it, with your role.
The window where you allow Claude
Connect ChatGPT
Mewboard is in the ChatGPT plugin directory. Open its page and press Install plugin, or find Mewboard under Plugins in the left menu of ChatGPT.
A Mewboard window opens, the same as for Claude: sign in and press Allow. Then just ask in the chat, for example: “Through Mewboard, show the open issues of project WEB”.
Your own Mewboard server? Add it in ChatGPT as a custom MCP server: Plugins → Add → Add custom MCP server, authentication OAuth, with your server's address ending in /mcp.
Claude Code and other agents
Claude Code connects the same way, with its own sign-in:
claude mcp add --transport http mewboard https://app.mewboard.com/mcp
Then type /mcp in Claude Code and sign in to Mewboard in the window that opens.
For agents and scripts that cannot sign in through a browser, create an access key in My account with Create an access key for a program. The key is shown only once. How to use it (for developers) gives the ready command. A key works as you, until you remove it.
An administrator can also add a separate program account, for example "Claude Code", so the agent's work is signed with its own name.
A new access key, with the command for Claude Code
What an agent can do
The same as a person with the same role: read and search, create and change projects, issues, milestones, checklists and comments, attach and read files, and move issues to the trash. One call can read an entire issue with its comments and files, pictures included.
Tools
What they do
list_projectsget_projectread_project
List projects, open one, or read it whole with its files
create_projectupdate_project
Create a project, change its name, key, status or dates
list_issuessearch
Find issues by status, person, label, milestone or words
get_issueread_issue
Open an issue, or read everything about it in one call
Upload files, list them, read them (pictures as pictures)
You stay in control
Every change an agent makes is recorded under the name of its account and shows up live for the team, like anyone else's. Apps connected to my account lists your connections and keys with the date of their last use. Disconnect or Remove cuts one off at once. Administrators see every connection of the workspace in Connected apps.
Every connection in the workspace: Claude and four access keys
09
People and access
Invite your team and your clients, and decide who sees what.
Roles
Administrator
Member
Viewer
See projects, issues and files
✓
✓
✓
Create and change issues, comments, milestones
✓
✓
—
Create and delete projects
✓
✓
—
Connect Telegram and email to a project
✓
✓
—
Add people, set roles and access
✓
—
—
See every connected app and key
✓
—
—
Export or delete the workspace
✓
—
—
A workspace always keeps at least one administrator, and nobody can lock themselves out.
People and programs
People lists everyone in the workspace with their role and access. Add a person or a program creates an account at once: a name, a role, an email if you like, and a password. Leave the password empty to create a program, such as an AI assistant, that works only with an access key.
Reset password gives someone a new password and signs them out everywhere.
Pause blocks an account without deleting anything; Allow again lets them back in.
Delete takes someone out of this workspace. The issues and comments they wrote stay.
A workspace can have any number of people, programs included.
Three people and a program; an invitation link for a viewer
Access to chosen projects
Press All projects next to a member or a viewer to limit them to some projects. They will not see, find or receive notifications from the others, and neither will their agents or their Telegram. Administrators always see everything.
Ana works only on the website and with clients
Invitation links
Under Invitation links, choose the role and press Create link. Send the link to someone who already has a Mewboard account: they open it, confirm, and join. Add their email, and Mewboard sends the invitation for you. A link works once and for 14 days; Copy link and Delete are next to it.
10
Your account and your data
Your profile, your password, and a full copy of your work whenever you want it.
My account
The workspace: how many projects, people and megabytes it uses out of its plan, and Leave this workspace… if you are in more than one.
Profile: your name and email.
Sign in with Telegram: link your Telegram for one-tap sign-in.
Password: change it; other devices are signed out.
Apps connected to my account: connections and access keys.
Your data: export or delete the workspace (administrators).
My account
Download everything
Download export gives one ZIP file with all the workspace's people, projects, milestones, issues, checklists and comments in a readable JSON file, and every uploaded file next to it. Passwords and keys are never included.
Delete the workspace
Delete this workspace… erases all its projects, issues, comments and files at once, and the accounts of the people who are in no other workspace. To be sure, you type the workspace name and your password. Download the export first.
Plan and limits
Price
$12 a month · $99 a year · $149 once
Trial
7 days, everything included
Projects per workspace
unlimited
People per workspace
unlimited, programs included
File storage
20 GB · 100 MB a file
Workspaces you administer
3
Trash
14 days
Notifications kept
45 days
Everything else in this guide
included
11
Make it yours
Twelve themes, light and dark, your own accent colour, thirteen languages.
Appearance
Appearance in the sidebar. Mode: System, Light or Dark. Theme: Mewboard, Linear, GitHub, Dracula, Catppuccin, Gruvbox, Everforest, Nord, Tokyo Night, Rosé Pine, Solarized, Temple, One Dark, Monokai, VS Code, Material, Palenight, Ayu, Kanagawa, Night Owl, Tomorrow, Nightfox, Iceberg, Vitesse, Horizon, Flexoki, Synthwave ’84, Cobalt2, Shades of Purple or Notion, each in light and dark. Accent color: twelve ready colours or any colour by its code. Sounds: the two sounds and their volume. Changes apply at once and belong to this device.
AppearanceDark mode
DraculaNordGruvboxSolarized
13 languages
English, Русский, Українська, 中文, Español, Français, Deutsch, Português, Italiano, Polski, Türkçe, 日本語 and 한국어. Choose under Language in Appearance. Dates follow the language, and so do the emails Mewboard sends you and the page where you allow Claude. Each person can use their own language in the same workspace.
Choosing a language
12
On your phone
The same app, laid out for a small screen.
Phone layout
The sidebar hides behind the menu button, the bell stays at the top, and a round plus button creates issues. Swipe the board sideways, press and hold a card to drag it. An issue opens full screen, with its details below the text.
The boardThe menuAn issue
Install it like an app
In your phone's browser, choose Add to Home Screen (or Install app on a computer). Mewboard then opens in its own window with its own icon, and it shows up in the Share menu of other apps.
13
For developers
Everything in the app is also an API.
REST API
Send an access key as Authorization: Bearer mb_… to https://app.mewboard.com/api. Answers are JSON. Issues are named by their number (WEB-12) or their id everywhere. The key has the same role and access as its owner.
/api/projects
Projects: list, create, change, move to the trash, restore
/api/issues
Issues, with filters by project, status, person, label and milestone
/api/comments
Comments of an issue or a project
/api/issues/WEB-12/checklists
Checklists and their items
/api/milestones
Milestones
/api/attachments
Upload a file as the request body; read it from /api/files
/api/search?q=
Search issues and projects
/api/trash
The trash
/api/activity
The notification feed
/api/events
Live updates as Server-Sent Events
MCP server
https://app.mewboard.com/mcp speaks MCP over HTTP. Clients that support OAuth find the sign-in by themselves and register automatically; others send an access key in the Authorization header.
When an agent connects, Mewboard hands it a short guide to everything it can do: projects and issues, checklists, comments and files, own statuses and fields, templates, notifications, reminders, the trash and undo, with typical requests like “set up a project for an online shop”. The full list of tools is on the connector page.
Fast at any size
Search finds an issue among a million in about 50 ms. Big projects load in pages, and boards draw 50 cards per column at a time, so a long backlog stays quick.